Mekozo

Find a guide

Choose a language

EnglishDeutschNederlandsItaliano

Two years in photos

Explore the villa

From the day I got the keys in the summer of 2024 to the first tiled floors two years later: the restoration of my abandoned villa in rural Sicily, told stage by stage in my own photos, with the episode that shows each job.

The villa at golden hour, with its round tower and arched porch
  • 20+years empty before I bought it
  • 90+weekly episodes so far
  • 40,000 Lunderground rainwater tank
  • 110 m²of floor tiled by hand
  1. Getting the keys

    The gates had rusted, the garden was dry grass and nobody had lived here for over 20 years. These are the first photos I took as the owner, in the summer of 2024.

  2. What 20 years empty looks like

    The rooms exactly as I found them: furniture left behind, damp on the walls, an old tiled bathroom and a kitchen the rats had taken over. I took these on my old camera in the first days.

  3. Clearing it out

    Before any building work, everything had to come out: old fridges, furniture and the rusted roller shutters.

  4. What the house was hiding

    Clearing out the house turned up a stack of old letters, certificates and papers. As I translated them, one name kept coming back: a teacher born in 1899, whose link to the house I am still piecing together.

  5. Breaking through

    Then the heavy work: stripping the walls back, replacing failed lintels and cutting a doorway through the stone into the tower. The green crosses mark every wall and ceiling I wanted plastered, so the plasterers could price exactly that.

  6. Power and water inside the walls

    Every cable and pipe now runs inside the walls. I cut the chases myself, laid the multilayer water pipes, with red and blue lines marking the hot and cold runs, and pressure tested the system before anything was covered.

  7. New windows

    The old metal windows came out, and the scrap collector took the frames away in his little three wheeled Ape. Some openings were cut larger or rebuilt with new lintels, and I rendered each reveal and finished it with a marble sill, while boards kept the weather and the rodents out. Then, two years after I got the keys, a team of five fitted the new made to measure aluminium windows and doors.

  8. Plaster at last

    Nineteen months after I got the keys, the walls were plastered in breathable lime and mineral plaster, and for the first time the house felt like a home. One stone wall I ground back and left on show.

  9. Water from scratch

    The villa had no mains water, so water became a project of its own: rebuilding the old well in handmade terracotta bricks, tanks for the roof water and the garden, and a 40,000 litre underground rainwater tank in the back garden, its base poured by a concrete pump.

  10. The garden becomes a building site

    Outside came the big digs: an excavator in the back garden, steel mesh and footings for the rear terrace, new covers on the old cesspit chambers and pallet after pallet of tufa blocks.

  11. Floors I could finally walk on

    Two years in, I tiled the floors myself for the first time: about 110 square metres, with every cut made to fit, even around the curved wall of the tower room.

  12. The garden comes back to life

    Between the building jobs the garden has come back: bees in the hives, drip irrigation for the fruit trees, my Nocellara olive trees setting a proper crop at last and a log store built from pallets.

  13. The cats

    And then there are the cats: two kittens I found close to death in a thunderstorm, the mother cat who came back for them, and Fang, the kitten who has grown up on site.

  14. Life at the villa

    It has not all been work: a coffee on the porch steps, an evening beer under the arch, rides along the lane and sunsets on the roof with my boys.

Then and now

The same places on my first days and today.

The same room on the first day and today
The main room, before and after
The front of the villa
The gates

Around the villa

The villa through the seasons: spring flowers by the porch, the olive trees, golden hour through the pines and the first finished room. There is still a long way to go, and I share every step in a new episode each Sunday.

Follow the rest of the story

A new episode goes out every Sunday, and the villa’s history, from the letters I found to the building amnesty papers, has a page of its own.

Frequently asked questions

Where is the villa?

In the countryside of western Sicily. I share the restoration openly, but not the exact address, so the photos here carry no location data, and house numbers and number plates are blurred.

How much did the villa cost?

I paid €21,500 for it. Episode 9, “How much did I pay for the villa?”, goes through the purchase.

How long has the restoration taken so far?

I got the keys in the summer of 2024. Two years on, the villa has new windows, plastered rooms and tiled floors, and the work is still going, with a new episode every Sunday.

Do you do the work yourself?

Most of it, yes: the clearing, chasing, plumbing, window reveals and sills, groundworks and tiling. Specialists did the jobs that need them, such as the electrics, the plastering, fitting the new windows and doors, the excavator work and the concrete pump.

Can I use these photos?

All the photos are Operation Sicily®, all rights reserved. If you would like to use one, please get in touch through the contact page first.

Credits

All photos: Operation Sicily®, all rights reserved. Operation Sicily® is a registered trade mark of Jonathan Smith.

1 of 107 The rusted original gates, on the day I got the keys

YouTubeThe weekly YouTube series

Meet the renovation behind the guides.

I film the work as it happens: the difficult jobs, the breakthroughs and the garden. The weekly videos are at the heart of Operation Sicily.

A project by Jonathan Smith.