In this episode

  • A 160 litre cement mixer, sand, cement and a long SDS bit from Leroy Merlin
  • Pendant lights in the lounge placed symmetrically with a laser level
  • Two large tree stumps burnt out with charcoal
  • Back boxes and the consumer unit cemented into the stone walls
  • How I found a notary, geometra, electrician and digger operator

A cement mixer from Leroy Merlin

This week I explain how I found tradesmen in Sicily, the notary, geometra, electrician and digger operator, while the electrical work carries on. It starts with a run to Leroy Merlin in Palermo. It is quite a drive, but the selection of materials and tools is massive, so I go when I need a few bits.

I come back with sand and cement for fixing the back boxes into the walls ready for the electrician, charcoal for burning out the tree stumps, tarps for when the aggregate and sand arrive, a long 18 mm drill bit for going through the house wall for the outside lights, and a big 160 litre cement mixer for the concrete and footings to come.

Chasing the lounge and placing the pendant lights

In the lounge I grind the outlines of the wall chases, then break them out for the back boxes and ducting. Before cutting the chases for the ceiling lights, I measure and mark where the pendant lights will hang, and use my laser level to line everything up so they sit symmetrically in the room.

Out in the front garden I use charcoal to burn out two large tree stumps, part of clearing the ground for the planter beds.

Setting the back boxes in concrete

Next I mix concrete and fix the back boxes and the consumer unit into the walls. Inside the chases will run plastic ducting, with two tubes up to each socket and the electrical cable threaded through them later. Before the mortar goes in, I spray each hole with water. The stone here is dry, powdery and porous, and if it is not wetted first it sucks the moisture straight out of the mortar, which can lead to cracking.

Then I drill through the wall of the small bedroom for the cables that will feed the garden lighting, the outbuildings and the pool pump, and for the pipe that will bring water in. The rubble from the chases goes out to the back garden as backfill for the rear terrace, which needs raising by about 3 feet. The ducting is concreted in over the next few weeks, in episode 19 and episode 22.

How I found tradesmen in Sicily

One of the most common questions I get is how I found the professionals on this renovation. Building a network of reliable contacts in a new country was one of the most daunting parts at the start, and every contact feels like a small win.

  • The notary. The notaio handles the legal paperwork, checks the sale is legitimate and registers the property in your name. I found mine on gov.uk, which has a list of English speaking notaries in Italy. I contacted several and went with my gut. My guide to what Italian notaries do explains the role.
  • The geometra. My notary was not local, but he pointed me to the College of Geometras in Trapani, whose website has a full list. I chose someone with years of local experience, which is vital for permits.
  • The electrician. A recommendation from a nearby restaurant that had just been beautifully renovated. When I mentioned him to my geometra, he said I had found the best electrician around.
  • The digger operator. Believe it or not, I found him on Facebook Marketplace. Hiring an excavator myself meant huge delivery costs, so I found a landscaper whose work looked great on his Facebook page. He also put me onto the company that felled the trees by the front gate.
  • Builders merchants and window manufacturers. My geometra has been a gold mine of recommendations.
  • The electricity supply. My translator friend and I visited the local energy company's office. They confirmed that once the installation is complete, the connection should be quick, so it made sense to get everything ready first.

With a mix of recommendations, research and a bit of luck, it has been much easier than I expected. The language barrier complicates things at times, but it has not been a huge problem, thanks to the kindness of the Sicilian people.

What this means if you are buying

If you are buying in Sicily, the order matters. The notary comes first, at the purchase. The geometra comes next, because nothing structural or electrical happens without the right permits. The geometra then becomes the best source of everyone else. The buying timeline planner sets out the purchase stages, and my guide to the geometra explains why that one hire shapes the rest.

The day ends with the rubble cleared from the main bedroom and the end of the day in rural Sicily. Next, in episode 19, the cement mixer gets its first proper use.

Frequently asked questions

How do you find an English speaking notary in Italy?

I used the list of English speaking notaries in Italy on gov.uk, contacted several and chose the one I felt most comfortable with.

How do you find a geometra in Sicily?

My notary pointed me to the College of Geometras in Trapani, whose website lists its members. I picked one with years of local experience.

Why wet the wall before setting back boxes in mortar?

The local stone is dry, powdery and porous. If it is not sprayed with water first, it draws the moisture out of the mortar too quickly, which can cause cracking.

What did the energy company say about connecting power to the villa?

I visited the local energy company office with a translator friend. They said that once the installation is complete, the connection itself should be quick.