How the calculator works
It starts from a percentage for the state of the building: 10% for a sound house, 15% for a tired one, 20% for an old house that has stood empty and 25% for a ruin. It then adds for the things that make surprises more likely, such as no survey, no fixed quotes, structural work, a protected building or managing from abroad, and takes a little off for fixed-price quotes. The result is kept between 10% and 40%. That top figure is the calculator's limit, not a safe maximum: a ruin with serious structural unknowns can need more, so ask your geometra or engineer once they have seen it.
The table shows what happens if the work runs 10%, 20%, 30% or 50% over, and how much you would be short with the money you have.
Where the surprises hide
In old Sicilian houses the usual culprits are roof timbers, damp in thick stone walls, floors that need rebuilding rather than repairing, old or missing drains, and electrics that have to be replaced in full to be certified. Paperwork can surprise you too: work done years ago without permits may need putting right before you can start.
Frequently asked questions
How much contingency should I allow for a renovation?
About 10% for a sound, fairly modern building, 15 to 20% for an older house and 25% or more for a ruin. Add more if the building has not been surveyed or the prices are not fixed yet.
Why do renovations in Italy go over budget?
Hidden problems in old buildings, changes made during the work, extra permits or approvals, and rising prices for materials and labour. Managing from abroad adds travel and slower decisions.
Should the contingency be part of the budget?
Keep it separate and agree with yourself that it is only for real surprises, not upgrades. If you finish without touching it, that is a bonus.
Do fixed-price quotes remove the risk?
They reduce it, but builders usually exclude hidden problems such as rotten beams or bad foundations. Read what the quote leaves out.
What if I cannot afford the contingency?
Trim the plan, phase the work so the essentials come first, or wait until you can. Running out of money halfway is the most common reason renovations stall.
Sources and small print
The percentages are common rules of thumb from surveyors, builders and project managers, adjusted with our own experience of renovating in Sicily. They are a guide, not a quote: your geometra or builder can tell you more about the risks in your particular building.