How the checker works
Each kind of work is linked to the permit route it usually needs under the national rules. If you tick several, the checker shows the biggest route among them, because one application covers the whole project.
It then adds the approvals that sit alongside the building permit: the structural (seismic) procedure with the Genio Civile for structural work, and landscape consent or the Soprintendenza for protected areas and listed buildings.
The four routes
- Edilizia libera: ordinary maintenance, with no permit or notice.
- CILA: a notice filed by a geometra, architect or engineer, for work that does not touch the structure.
- SCIA: a certified notice for work on the structure, with an engineer's design.
- Permesso di costruire: a full permit for new building, extensions and the biggest changes.
Frequently asked questions
Do I need planning permission to renovate a house in Italy?
It depends on the work. Ordinary repairs and like-for-like replacements need nothing. Changing the layout usually needs a CILA, work on the structure a SCIA, and extensions or new buildings a permesso di costruire.
What is a CILA?
A CILA (Comunicazione di Inizio Lavori Asseverata) is a notice to the town hall, signed by a geometra, architect or engineer, for internal work that does not touch the structure. Work can usually start once it is filed.
What is the difference between a CILA and a SCIA?
A SCIA is needed for heavier work, especially on the structure, such as load-bearing walls, floors and roof beams. It needs more paperwork, including a structural design, and in Sicily the seismic procedure as well.
How long does a permesso di costruire take?
The legal limit is 90 days from a complete application, but in rural Sicily it is wise to plan on six months or more, especially if landscape consent is needed too.
What happens if I build without the right permit?
You can be fined, ordered to undo the work, and have trouble selling, because the notary checks that the building matches its permits. Always check before you start.
Sources and small print
Routes follow the national building code (DPR 380/2001 on Normattiva), the government's glossary of free building work (2018) and the 2024 changes for solar panels, which Sicily applies through regional law 16/2016 with its own additions.
This checker shows the usual route, not a ruling for your house. Local plans, protections and the house's own permit history can change the answer, so confirm with a geometra or the town hall's technical office before you start.