In this episode
- A kitchen door lock that only works from one side
- The electrician inspects the ducting, and it all passes
- A strong 3:1 concrete mix poured over the floor ducting by head torch
- Scraping the high spots while the concrete is still dark and workable
- The old kitchen sink saved for an outdoor kitchen
Locks, rusty windows and the tower switch
This week the electrical ducting gets concreted into the chases, but the day starts with a couple of niggles. The kitchen door lock only works from one side, and the window frames in the main bedroom are so rusted that they will need restoring. Both go on the list.
Then I feed the ducting through the back box for the tower light switch and start fitting the ducting on the veranda, before feeding the stray cat. The chases themselves were cut over the previous few weeks, from episode 17 onwards.
The electrician's inspection
With a cold beer in hand, I wait for the electrician to check my work. This is the inspection I held off for in episode 21, because once the chases are concreted over, nothing can be changed without breaking them out again. He checks the ducting, and it all passes.
Concreting the floor chases by head torch
By the time I start it is dark, so I work by head torch. First I wet every groove with the pressure sprayer. The stone here is dry and porous, and if it is not dampened it draws the water straight out of the mix, as I explained when setting the back boxes in episode 18. Then I pour a strong 3:1 concrete mix over the floor ducting, filling each chase and working it level with the surrounding tiles.
All the ducting is now in everywhere, for every socket and light switch. The next stage is concreting all the wall chases too, and eventually every wall will be plaster skimmed.
Scraping back while it is still workable
The next morning, after a drive along the Mazara del Vallo seafront, I am back on the floors. While the concrete is still slightly pliable, I scrape off the high spots and the residue round the edges, then brush everything up. At this stage it is still dark brown and can be scraped. Once it dries fully it turns light grey and goes rock solid, and then there is no scraping it. Timing matters.
The floors will eventually be tiled straight over the existing tiles, which will be absolutely fine. You can see that happen in episode 86.
From chases to plaster
It helps to see where this step sits in the whole job. Because Italian walls and floors are solid, every cable runs in conduit buried in the structure, so the rewire happens in layers. The chases were cut, the back boxes cemented in, the conduit laid and fixed, and now the floor chases are filled. The wall chases follow in episode 24. Only then can the walls be plastered, which happens in episode 70, and the sockets and switches go on at the very end. Every layer has to be right before the next one covers it, which is why the inspection mattered so much.
Saving the old kitchen sink
I also managed to keep the old kitchen sink, the one I scrubbed clean in episode 6. It cleaned up really well and I plan to reuse it in the outdoor kitchen. Unfortunately, the footage of removing the rest of the kitchen was lost along with everything else on the hard drive I talked about in episode 16.
Why I am documenting this renovation
I end the week explaining why I make these videos. It is not to be a YouTuber or for the money, which at this point is not even pocket money. It is to document the journey and hopefully help anyone thinking about relocating to another country and buying a property.
To most people a house like this would look overwhelming. It is really not, if you break the whole process into steps and work through them one at a time. It is a huge amount of work, but if you are prepared to put the hours in and you are a grafter, it is achievable. My timeline of year one shows what that looks like in practice, and the renovate a ruin quiz is an honest check on whether it is for you.
The other reason is my boys. They are young now, but when they are older I do not want them to think we simply have a house in Sicily. I want them to be able to look back at these videos and see all the work that went into creating it. Answering every comment is a job in itself, but out of courtesy I try my best, so keep the questions coming.
Frequently asked questions
What concrete mix do you use to fill electrical chases?
I used a strong 3:1 mix for the floor chases, after wetting each groove with a pressure sprayer so the porous stone did not draw the water out of the concrete.
When should you scrape back fresh concrete?
While it is still dark and slightly pliable, usually the next morning. Once it dries to a light grey it is rock solid and can no longer be scraped.
Should the electrician check ducting before it is concreted in?
Yes. I waited for the electrician to inspect every run first, because once the chases are concreted over, any change means breaking them out again.
Can you tile over existing floor tiles?
That is my plan at the villa. The new floor tiles go straight over the old ones once the chases in the floor are filled and level.
More episodes on the same job: Rewiring and electrics