In this episode
- Two tree stumps, dried for six months, belt sanded for coffee tables
- The outbuilding sketched and marked out with string lines
- Orange soil pipe laid as ducting for water pipes and power cables
- Two 450 litre pressure tanks, filtration and a boiler planned for the pump house
- A shed snake skin found under the well foundation
Tree stumps into coffee tables
This week is all about laying underground ducting for the off grid outbuilding, but it starts on the veranda with a feline welcome at the back door. Two thick tree stumps have been drying for around six months. They will probably need another six to fully season, but they feel pretty dry already, so I belt sand the tops to see how they come up. Eventually I want to use them as coffee tables. The dust is vacuumed off to reveal the grain.
Sketching and marking out the outbuilding
After untangling the builder's string line, I sit down with a notebook and ruler and sketch the layout of the outbuilding, the pump house that will sit on the rear terrace. Then I take it outside. Using a long measuring board, metal stakes and string lines, I mark where the outbuilding walls will go on the terrace I have been building since episode 37.
The string line marks the outbuilding, which will house the pressure pump for the well. Marking it out first ensures the pipes come up in the right place, because once the terrace is backfilled, there is no moving them.
Laying ducting for water and power
At the well, I cut the old pipe from the casing and chisel the edges of the opening in the concrete slab I poured in episode 39. Then I break through rock and rubble beside the foundation wall with the demolition hammer to clear a route.
The ducting is large orange soil pipe, laid across the foundation and levelled on blocks and mortar. Through it I pull the blue and red water pipes and the black power cable towards the entry point in the house wall, the opening I made in episode 43. At the wall, the bundle is fed into the elbow and taped tight. All the while, the cats follow me around. They have learned that meowing usually gets them food, so now I have a furry choir.
Then concrete is shovelled in around the ducting to hold it in place against the wall base and the riser pipe. The riser is capped and taped to keep out debris, the pipe into the well slab is taped over, and I cut two slots in the top of the foundation wall with the grinder for the services. Finally I mortar around the pipes where they enter the house and brush it smooth.
How the off grid water system will work
The orange soil pipes are acting as underground ducting. They will come up through the floor of the outbuilding and carry the hot and cold water pipes along with the power cables that supply it. Inside the outbuilding I am planning:
- Lighting and several extra sockets.
- Two 450 litre pressure tanks.
- A filtration system.
- A gas boiler for hot water.
Water will be pumped to the house from two sources: the well, and the underground rainwater tank I am yet to build, first planned in episode 30. One final ducting pipe still needs installing to connect the outbuilding to that tank. The young excavator lad will come back to dig the trenches and the large hole, and I will build the tank myself from the leftover terrace blocks, though I will need a lot more. Once complete, it will hold at least 18,000 litres.
After being pumped, the water enters the pressure tanks, passes through the filtration and then goes either to the gas boiler for hot water or straight into the cold line to the house. The well also needs building up with the handmade terracotta bricks from episode 42. Only once the tank and the well are done can I backfill the terrace and build the outbuilding properly. All of it is essential for a reliable, year round water supply. My guide to off grid versus mains water and the rainwater harvesting calculator go further into the sums.
A snake skin, the weather and the trail cameras
Under the edge of the formwork at the well foundation, I find a large shed snake skin. I pull out what I can, but I am not going to stick my fingers any further under there. Then I set up two digital thermometers, one on the workshop windowsill and one taped to a fruit tree branch outside. The outdoor one reads 31.8°C at 49% humidity.
The young fruit trees in the front garden are freed from their supports, and I set up a trail camera on a post in the orchard. Overnight it catches a cat and a hedgehog, and by day a magpie and a pigeon on the grass. My article on living off grid in Sicily covers what daily life here is really like.
Frequently asked questions
What goes in an off grid pump house?
Mine is planned to hold two 450 litre pressure tanks, a filtration system, a gas boiler for hot water, lighting and several sockets, fed by the well and a rainwater tank.
Can you use soil pipe as underground ducting?
I used large orange soil pipe as ducting to carry the water pipes and power cables under the terrace and up into the outbuilding, then concreted around it.
How long should tree stumps dry before making furniture?
Mine had dried for about six months and felt dry, but I expect they need around another six months to season fully before becoming coffee tables.
How does well water reach the house off grid?
At my villa it will be pumped into pressure tanks, filtered, then sent either to a gas boiler for hot water or straight into the cold line to the house.