In this episode

  • Stone blocks set out dry along the new terrace footings
  • A profile batten and string lines for a precise layout
  • The first course laid by head torch into the night
  • Galvanised brackets tying every course into the house wall
  • A wooden ramp for two lizards stuck in an old bath

Setting out the blocks

This week I start building a block retaining wall for the garden terrace. The back of the villa has always been a plain concrete box, and this is where the transformation really begins. The concrete footings went in during episode 34, and the stone blocks were delivered in episode 36.

I take the blocks off the pallet and set them out dry along the perimeter of the future terrace wall, on top of the footing, checking the line and height with a long spirit level as I go. The terrace layout itself was set out with its falls for rainwater in episode 31 and squared with the 3 4 5 method in episode 32.

A lizard rescue

This one is not renovation based. Two small lizards have been in the old bath at the side of the garden for the last three days, and I think they could be stuck. The sides of the bath are really slippery, and with their feet wet from the rainwater in it, they just keep sliding down.

The bath was going to be an overflow for the water tank round the side of the house, but I had to move it, because I have problems with my drains and need to dig at the side to find out what is going on. I trace those drains in episode 40. I have also found a few dead lizards in the main water tank, unfortunately, so I think they love the water.

So I take a piece of scrap wood and lay it diagonally into the bath as a ramp, so they can climb out if they need to. When I check back, the ladder for the lizards has worked. I do think they like that water, though, probably because that is where the mosquitoes and flies hang around. They seem quite happy in there, sunbathing and catching flies.

String lines for a precise layout

I fix a timber profile batten to the corner of the house, then use a claw hammer, line blocks and pins to run bright pink string lines along the footing, setting the guide levels for each course.

With the blocks laid out and the string lines up, I just need to get a mix on and start laying. Before that, though, I head up to the supermarket for some cold beers. It would not be right to start laying blocks in this sunshine without them.

Laying the first course

With the mortar mixed, the first course goes down along the footing. Each block is bedded on mortar, tapped down with the rubber mallet and checked against the pink line. It runs from the afternoon into the dark, and I carry on by head torch, placing and levelling blocks along the guide line.

The next day, the first course has set. I sweep the excess mortar and debris off the tops of the blocks, trim the loose ends of the string and move the profile line up for the second course. Along the corner of the terrace, the corner blocks go in on top of the rubble and backfill, and I carry more blocks over from the delivery pile and stage them along the wall.

Sealing around the pipes, and backfilling

At the corner of the house, I unscrew the temporary guide batten, clean out around the exposed blue water pipe conduits and fill around the hole with expanding foam. Plugging holes like this in the ductwork keeps the insects out.

Then the backfilling begins. I shovel the excavated soil and rock into the wheelbarrow, wheel it round to the outside of the new wall, tip it and rake and compact it against the blocks, packing local soil around the footings.

Tying the wall into the house

On the porch, I run the cement mixer and barrow the mortar out to the terrace. Where the new wall meets the house, the blocks have to be trimmed to fit, so I shape them with a bolster chisel and club hammer and lay the courses right into the corner.

This morning I went to the DIY shop and got some galvanised steel brackets. Each course is going to be bracketed into the house wall, which effectively ties this wall into the building. Another thing to note: this terrace wall and the house are all going to be rendered as one. So I am not particularly bothered how the face of the blockwork looks. The main thing is that it is structurally solid.

This terrace wall is going to act as a retaining wall. There will be a lot of backfill behind it and a lot of compacting of that backfill, so what matters is the structure. My article on traditional lime mortar and Sicilian stonework covers the older walls on the property, and my guide to building permits in Sicily covers the paperwork side of new structures.

Building up the courses

From the flat roof, the view takes in the whole rear garden, the olive groves and the countryside around the villa. Back on the ground, I keep going: more blocks carried over, more mortar mixed, and the stepped second and third courses laid along the wall, with the joints swept down and the line checked as I go. One of the cats sits beside the wall to supervise.

At the end of the day, by head torch again, I empty and wash out the mixer, brush down the porch tiles and lock up. The corners of the terrace are built in episode 38, and the walls around the old well in episode 39. My practical guide to renovating in Sicily and my article on living off grid in Sicily show where this terrace fits in.

Frequently asked questions

Why bracket each course of a terrace wall into the house?

I bought galvanised steel brackets and bracketed every course of my new terrace wall into the house wall, which ties the two together.

Why use string lines when laying blocks?

I fixed a profile batten to the corner of the house and ran string lines with line blocks and pins, to set the guide level for each course of blocks.

Does the face of a rendered block wall matter?

My terrace wall and the house will be rendered as one, so I was not bothered how the blockwork face looked. The main thing was that it was structurally solid.

How do you help a lizard out of a bath?

Two lizards were stuck in my old bath, sliding down the wet sides. I laid a piece of scrap wood in diagonally as a ramp, and they used it to get out.