In this episode
- Mortar mixed in small batches because of 39°C heat
- Terracotta bricks soaked before laying the first circular course
- The last brick cut at an angle with a petrol concrete saw to close the ring
- Three courses laid, pointed and cleaned, inside and out
- A split strimmer fuel line replaced and the blade sharpened
Building in 39°C
This week I start rebuilding the water well with handmade terracotta bricks, the ones that arrived by crane in episode 42. It is 39°C today, and every task feels twice as hard in this heat. I set up the cement mixer on the veranda, carry buckets of sand up the steps from the pile in the front yard and load the drum.
For now I am keeping to really small mixes because of the heat. Mortar goes off quickly when it is this hot, as the terrace walls showed me, so each small batch is wheeled straight over to the well and used before it stiffens.
Preparing the well and soaking the bricks
The well sits on the rear terrace, on the reinforced concrete base I poured in episode 39, with the orange ducting from episode 44 rising from the opening. I sweep the dust and debris from around the rim and wet the base down so it does not suck the water out of the first mortar bed.
The plan, set out in episode 38, is to replace the plain concrete surround with these bricks so the well becomes a feature of the patio. When they arrived I said they might be the first thing I had bought that is actually nice to look at, so I want to get this right.
The terracotta bricks get the same treatment. They are soaked before laying, for the same reason: a dry brick drinks the water from the mortar and the joint never bonds properly, a lesson that matters even more at 39°C.
Laying a round wall for the first time
This is my first time building anything like this, and it takes a little while to get my head around shaping a round wall. I lay a bed of mortar around the circular opening, then set the bricks one by one following the curve, checking each with the spirit level and tapping it into line. A kneeling pad and a straw hat make the hours in the sun bearable.
The trick with a circle is the last brick. The gap left to close the ring is never a full brick, so I mix fuel for my Stihl petrol concrete saw on the workbench and cut the final brick at an angle to fit. With the ring closed, I keep going, cutting more bricks to size for the tight curve, until three courses are built.
Pointing and cleaning the joints
As the sun starts to set, I clean the mortar lines with a pointing trowel, a jointing tool, a soft brush and a sponge, working on the outside faces and then leaning inside the well to point and sponge every interior joint. It is still a work in progress, and I ask what you think so far.
These first three courses will be hidden when the terrace is backfilled, leaving only the well interior visible. I am really pleased with how it turned out, and it was the perfect warm up for the next few courses, which will stand above the terrace as a patio feature. The well is finished, with its restored metal lids, in episode 47. My article on mortar and Sicilian stonework has more on building with traditional materials.
Servicing the petrol strimmer
After dark, the petrol strimmer comes onto the workbench. The fuel line has split, so I drain the remaining fuel, take off the air filter cover, route a new fuel line from a replacement kit, refit the cover and refill it with fresh fuel. Ideally I should drain the fuel from the strimmer whenever it is not in use, and that is a habit worth getting into.
Then I clamp the three point metal blade to the edge of the table and, in safety glasses, sharpen the bevel on each tip with the angle grinder before fitting it back onto the head. With grass growing as fast as it does here, as I said in episode 32, the strimmer gets a lot of use.
A cat and a night drive through Mazara del Vallo
A friendly stray cat wanders in under the work light for some food. Then a late drive back through Mazara del Vallo. At 10:30pm the streets are alive, with people of all ages out along the seafront and in the lit squares, and the atmosphere is incredible. My guide to living in rural Sicily covers daily life here, and the plan for the well water is set out in my article on off grid versus mains water.
Frequently asked questions
Should you soak terracotta bricks before laying them?
I soaked mine and wet the base before laying, because dry bricks pull the water out of the mortar. In 39°C heat that matters even more.
How do you close a circular brick wall?
The last gap is never a full brick, so I cut the final brick at an angle with a petrol concrete saw to fit and close the ring.
How do you mix mortar in very hot weather?
At 39°C I kept to really small mixes, wheeled straight to where I was working, so I could use each batch before it stiffened.
Why does a strimmer fuel line split?
Fuel lines perish over time. When mine split, I replaced it from a kit, and the lesson I took is to drain the fuel whenever the strimmer is not in use.
More episodes on the same job: Water and plumbing