In this episode
- A standard 3kW supply, and why I am not paying for more yet
- Sitting down with a real person at the local energy office
- New P3 filters for a respirator clogged with dust
- Ducting held with stones from the terrace, then locked in with expanding foam
- Working into the night by head torch with the laser level
Ducting the lounge and kitchen
This week a technician checks the meter, which means getting electricity connected to the villa in rural Sicily is finally weeks away. While I wait, the work is ducting in the lounge and kitchen. With the angle grinder, the SDS hammer drill and the generator ready, I take down the old ceiling light fittings and cut grooves and chases into the walls and floors, carrying on from episode 19.
Why I replaced my respirator filters
It is dusty work, so the first job is fitting new P3 filters to my respirator, posted out from Screwfix in the UK after a three week wait. While grinding the chases I kept tasting dust, and when I took the old filters apart they were completely clogged. They would not go back together, so I had been holding them with cable ties. I do not think they are meant to be cleaned, they are throwaway, and for about £10 it is not worth the risk. If you are chasing stone walls, change your filters as often as they need it.
How getting electricity connected in Sicily works
Getting power connected has been a surprisingly personal experience, and a reminder that things work a bit differently here. For a start, the standard supply is just 3kW, much lower than the UK average, so I have had to think carefully about how much energy I will need in the long run.
What really stood out was the process. No 0800 numbers and no hours on hold. I went to the local energy office and sat down with a real person who walked me through it, as I described in episode 18. I am starting with 3kW, enough for the basics while the renovation carries on. It does not make sense to pay for more until the big users, the air conditioning, the water heater and the pool pump, are installed. When that time comes, I can pop back to the office or call them to increase it.
Supply is usually capped at 10kW, but because I am in rural Sicily, where there is less strain on the grid, I should be able to go higher if needed, even on single phase. Today a technician came to check the existing meter, and everything is good to go. The new meter will be fitted soon, and I will have power within weeks.
It feels like a huge milestone. Until now it has felt like renovating a glorified garden shed, with no water and no electricity, just a shell. Power is the first real sign of this abandoned villa becoming a working home. My guide to setting up utilities in rural Sicily covers water and gas as well, and the off grid solar calculator shows how solar could add to a small grid supply.
Stones, expanding foam and a whistling kettle
After morning views and biscuits for the stray cat, I collect stones from the garden terrace area to hold the plastic ducting down in the floor chases. That rubble will later help raise the terrace by about 3 feet. Once the ducting is set, I lock it in with expanding foam.
If you use expanding foam, I highly recommend a foam gun. They are far better than the throwaway cans with a little straw, they only cost around £15 to £20, and you can adjust the flow. The foam is only there to hold the ducting in place. Once it is dry, the tops are trimmed off so nothing sticks out, ready to be patched over with concrete in episode 22. Between jobs there is tea from the whistling kettle over the fire.
Working into the night
After trimming the ducting and tidying up, I keep going after dark. By head torch, with the laser level for straight lines, I cut the channels and the back box for a socket on the veranda. There is also a big thank you to everyone for the support and kind messages in the comments, which keep me motivated.
Planning around a small supply
A 3kW supply shapes the whole house. Big loads like air conditioning, water heating and a pool pump cannot all run at once on it, which is why I am planning to increase the supply later, and why solar is on the list for the future. If you are buying in the Sicilian countryside, it is worth asking early what supply a house has and how far it is from the grid. My article on living off grid in Sicily looks at the other side of that choice. Next, in episode 21, the footings for the planter beds go in before the mains power cable is laid.
Frequently asked questions
What is the standard electricity supply in Italy?
The standard domestic supply is 3kW, much lower than in the UK. It can be increased by contacting the energy office, usually up to a cap of 10kW, and possibly higher in rural areas.
How do you get electricity connected in rural Sicily?
I went to the local energy office and sat down with someone who walked me through the process. A technician then checked the existing meter, and a new meter was due to be fitted within weeks.
What respirator filters do you need for chasing walls?
I use P3 filters. My old ones were completely clogged after grinding chases, so I replaced them, at about £10 a set.
Why use expanding foam on electrical ducting?
Only to hold the ducting in place in the chase. Once it is dry the excess is trimmed off flush, and the chase is patched over with concrete.
More episodes on the same job: Rewiring and electrics