In this episode

  • The last electrical sockets fitted and the newly tiled floor cleaned before the fitters arrive
  • The kitchen delivered by van and fitted from tall units to wall cupboards in one episode
  • Marble worktops and splashback, dark wood-effect doors and lighter wall cupboards
  • Built-in oven and microwave, fridge-freezer, washing machine and a five-ring gas hob
  • Only the tap and the sink trap left to fit after the reveal

Kitchen day at the villa

This is the Italian kitchen reveal I have been waiting for at my abandoned villa in Sicily. You can see where this room started in cleaning a kitchen abandoned for 20 years. In this episode my dream kitchen is finally installed, from the van pulling up to the final reveal.

The units were ordered and paid for months ago, and there was a three month lead time before they could be fitted. In the meantime the newly tiled kitchen floor was grouted in episode 91, so the room was ready for the units to go straight in.

Preparing the villa for the kitchen fitting

The villa had been boarded up while I was away, so the first job was taking the OSB boards off the entrance. Then I went round the kitchen walls, took out the screws and wall plugs that were still sticking out, and fitted the last electrical sockets. A small spirit level kept each socket straight.

The final job before the fitters arrived was a proper sweep of the new tiled floor.

How the kitchen went in, start to finish

The kitchen arrived by van, which parked under the archway, and was unloaded on a hand trolley, with the appliances still in their boxes. From there the fitters worked in a clear order, and the video shows it step by step:

  1. The tall unit carcasses were assembled on the floor, stood up and levelled along one wall.
  2. The fridge-freezer was slid into its housing in the tall units.
  3. The base units went in along the other walls, making an L-shaped kitchen, and were levelled and fixed together.
  4. The marble worktops went on, with the openings for the sink and the hob, followed by a matching marble splashback.
  5. A laser level marked the line for the wall cupboards, which were then hung above the worktop.
  6. The oven, microwave, gas hob and sink went in, the doors were hung and lined up, and the brushed steel plinths finished the bottom of the units.

The installation team were fantastic throughout. They were friendly and professional, and that made the whole process so much easier. If you are pricing up a kitchen of your own, the renovation contingency calculator helps you leave room in the budget for the jobs that always appear around it.

The reveal: marble worktops, steel and wood

I am absolutely made up with it. I love the marble worktops, and I love the colours. The base and tall units have dark wooden doors, and above the worktop there are smaller wall cupboards in a lighter colour, so the two contrast with each other. Running through the whole kitchen is brushed steel, on the rails along the units and on the plinths, and I love the contrast between that steel and the wooden doors.

Under the wall cupboards there are LED lights, which are going to be fantastic at night. The sink sits under the window, and the appliances are Bosch and AEG, with a Franke sink. I obviously had to go for all the mod cons: a built-in oven, a built-in microwave, a fridge-freezer and a washing machine.

The hob is a five-ring gas burner. I definitely prefer cooking on gas over an electric or induction hob. The villa runs off-grid, and I have written about setting up water, electricity and gas in rural Sicily from scratch.

Why kitchens often leave with the seller in Italy

While the units go in there is a fun fact on screen that is worth knowing if you are house hunting here. In Italy the kitchen is often treated as furniture, so it is common for people to take it with them when they move house.

So if you are buying a house in Italy, check whether the kitchen is included in the sale, and get it written into the compromesso, the preliminary contract. My free buying a house in Sicily checklist walks you through the other checks to make before you sign.

What is left to do in the kitchen

Now I have a kitchen. There are still a couple of small plumbing jobs: the tap needs fitting and the P-trap still has to go on under the sink. They are minor jobs.

There is still a lot to do across the villa, but this was another big milestone completed and a big job off the list. The episode ends with before and after shots, and after everything this room has been through, the new kitchen makes the villa feel more like a home than ever. If you are thinking about taking on a project like this, my guide to renovating a house in Sicily covers how I approach each stage.

Frequently asked questions

Is the kitchen included when you buy a house in Italy?

Not always. In Italy the kitchen is often treated as furniture, and it is common for sellers to take it with them when they move. Check whether it is included and get it written into the preliminary contract (compromesso) before you sign.

Why did you choose a gas hob for the villa kitchen?

I prefer cooking on gas over an electric or induction hob, so the kitchen has a five-ring gas burner.

What appliances are in the new villa kitchen?

A built-in oven, a built-in microwave, a fridge-freezer, a washing machine and a five-ring gas hob, with Bosch and AEG appliances and a Franke sink.

What was left to do after the kitchen was fitted?

Only small plumbing jobs. The tap still needed fitting, along with the P-trap under the sink. Everything else, from the units and worktops to the appliances and LED lights, was finished.